Infra & ComputeSubscribers only 14 min ago4Add to bookmarks

Nvidia commits $1.5 billion with Amkor for advanced AI chip packaging in Peoria (Arizona). One of the first public commitments of this size for a back-end located outside the TSMC / ASE Taiwan duo.
Nvidia announces a $1.5 billion agreement with Amkor Technology for the advanced assembly and packaging of AI chips on American soil, at Amkor's site in Peoria (Arizona). According to TechInAsia (July 24, 2026), this is one of the first public commitments of this size for a leading AI designer on a back-end located outside the dominant duo TSMC/ASE Taiwan, and one of the first public registrations of an American advanced packaging capacity in an Nvidia supply chain.
The contract is worth $1.5 billion and targets advanced packaging (CoWoS and derived technologies), as part of the already announced expansion of Amkor's site in Peoria - an expansion backed by the CHIPS Act and the partnership with the state of Arizona. The RSS TechInAsia notes that the agreement comes after the 10-year partnership announced between Amkor and TSMC to expand US capacity, also in Arizona. Nvidia has not publicly specified the duration of the contract, nor the breakdown by GPU generation concerned. On a market scale, TSMC remains largely dominant in global CoWoS capacity; this contract does not reverse the balance of power, it installs a serious second geography.
The point of tension in AI computing is shifting: from silicon (TSMC N3/N2) to the back-end (packaging, HBM, interposer). Nvidia is hedging against two simultaneous risks - the geopolitical concentration on Taiwan and the CoWoS queue at TSMC that structurally penalizes actors who are not Nvidia. Amkor becomes the de facto advanced American hub: a signal that goes far beyond Nvidia. AMD, Marvell, Broadcom are all looking for slots outside Taiwan and will push their own orders to Peoria - a capacity that, in the long run, will be arbitrated.
Positive signal for Amkor (credible adjacent revenues, valuation that must reflect the CHIPS bonus). Neutral to slightly positive for AMD and Broadcom, who gain negotiating power against TSMC. Neutral for Nvidia (risk coverage, no market expansion). For a CTO managing a GPU order queue, this changes nothing before the end of 2027 - but validates that the CoWoS pinch is structural, not conjunctural. For the CFO of a hyperscaler, the capex trajectory of 2027-28 must integrate a second source of CoWoS supply, with what that implies in negotiating power.
The quality of advanced packaging on US soil has not been validated on a large scale on the finest technologies. A yield defect would result in a direct cost penalty on Nvidia GPUs coming out of Peoria - problematic in a market where every point of gross margin counts. Critical substrates remain of Japanese origin (Shinko, Ibiden): US back-end sovereignty is not complete.
Announcements from substrate and critical material suppliers on their US plans, and the next packaging contracts from AMD and Broadcom - these will indicate whether Peoria becomes the second structural hub or remains an Nvidia cover.
Create a free account to access all our content and the weekly review.
Article produced by artificial intelligence, reviewed under human editorial control.
Sign in to join the discussion.
This is a strategic move for Nvidia, but I wonder about the environmental impact of such large-scale chip packaging operations.
This could be a game-changer for US tech independence, but will it lead to a new cold war in chip manufacturing?
Interesting move by Nvidia. Wonder if this will reduce their dependency on Asian foundries.
This investment signals Nvidia's commitment to diversifying its supply chain, but will it truly reduce dependency or just add another layer?
TSMC, point de pincement du compute : revenus, prix, capacité